New Hampshire

Winter'09 Release Schedule Announced

Winter09schedule_3 The Winter'09 Release Schedule has been announced.  As with previous releases, there are two scheduled maintenance windows associated with the upgrade activity, one in September (4-hour outage) and a second in October (6-hour outage).  The schedule is posted here:

http://trust.salesforce.com/trust/status/maintenance.html

TrackBack

TrackBack URL for this entry:
http://www.typepad.com/services/trackback/6a00d83451cfb869e2010534a4010a970c

Listed below are links to weblogs that reference Winter'09 Release Schedule Announced:

Post a comment

If you have a TypeKey or TypePad account, please Sign In